Log 3/29/11
Today I will be working on the switch for the oil tanker. I will also be preparing for the FPU that will take place on Friday.
Labels:
Logs
MP3 FPU Outline
- Introduction
- Background
- Oil Tankers
- Design Brief
- Group: Design and create an educational system to model the capture and transport of oil from undersea gushers.
- Individual: To design and construct a model of a device capable of transferring an oil-like substance to a retrieval storage device
- Specifications
- Must fit inside of the tank
- Must be buoyant
- Must be free of any leaks
- Must attach well to other parts of the project
- Must be able to shut off the flow of oil
§
§
§
- Limitations
- Cannot exceed the size of the tank
- Cannot take too long to build
- Total cost cannot exceed $100
- Power will be limited to what is available for the entire model
- Testing Procedures
- Discuss model
- Discuss final solution (drawings and final product)
- Show how final product works
- Discuss testing stages
- Discuss results of testing
- Summary
- Talk about final design
- Talk about testing
- Talk about the results of testing
- Conclusion
Wednesday, March 23, 2011
Log 3/23/11
This week I have been finishing up my final tanker model. The only thing I have left to do is finish the switch and attach the tanker to the other parts of the project. I am hoping to be done by this class because the final product is due tomorrow (DA extended the due date).
Labels:
Logs
Friday, March 18, 2011
Log 3/18/11
Today I will be working on the shut off switch for the tanks. I will also be working with my team to put our projects together.
Labels:
Logs
Wednesday, March 16, 2011
Log 3/16/11
Today, I will be starting to paint the tanker. Since I have to let this dry I can't work on anything else today.
Labels:
Logs
Monday, March 14, 2011
Log 3/14/11
This week I am planning on finishing the waterproofing, painting, and sealing of the model tanker. I think the caulking will be finished by today. Tomorrow I am planning on sealing the tanker. I plan on starting the painting of the tanker on Wednesday. On Thursday I am planning on finishing the painting. On Friday I am hoping to be working on the switch. This is my schedule as of today, however, things do go wrong so I am not completely sure.
Labels:
Logs
Wednesday, March 9, 2011
Log 3/9/11
Since the last time I logged, I have finished the construction of the tanks and I have attached the screw eyes for the mooring to my tanker. CML has attached the screw eyes to his false-bottom that will attach to my tanker. Today I plan to attache the tanks to the tanker and I will start the waterproofing.
Labels:
Logs
Monday, March 7, 2011
Log 3/7/11
This weekend I successfully finished the construction of the tanks for the model oil tanker. I now need to put the tanks and the tanker together. After I put the two together I will have to add more caulk and sealer. I will also have to paint the tanker, create the mooring lines, and attach the tanker to CML's piece.
Labels:
Logs
Tuesday, March 1, 2011
Log 3/1/11
Last week I did not finish the construction of the tanks for the tanker. I encountered a few problems after I cut the pieces of wood for the tanks, and so I had to re-cut the pieces. Today I will try to finish the construction of the tanks. I will also be talking to my team mates about the script for the final video.