Thursday, November 25, 2010
Log 11/25/10
Happy Thanksgiving! Yesterday I came across a huge problem! I realized that I haven't come up with the dimensions of the tanker and I also realized that I haven't looked at water pumps for the tanker.
Labels:
Logs
Tuesday, November 23, 2010
Log 11/23/10
Today I finished the CAD drawings for the tanker alternative solutions. I still need to come up with the alternative solutions for the system that stops the flow of oil in the tanker. I also need to come up with the alternative solutions for the system that will get the oil out of the water.
Labels:
Logs
Thursday, November 18, 2010
Log 11/18/10
Yesterday, I came up with some alternative solutions for the tanker and had a meeting with CMcD and DA. They liked my idea of having the tanks resemble an ice cube tray and I think it might be a viable solution. I started the drawings for the tank alternative solutions and I am also working on the alternative solutions for the system that will stop the oil flow to the tanker.
Labels:
Logs
Tuesday, November 16, 2010
Log 11/16/10
I finished my tanker drawings on CAD today and I annotated and labeled them. I am currently working on the alternative solutions for the system that will enable me to stop the flow of oil when my tanker fills up.
Labels:
Logs
Thursday, November 11, 2010
Log 11/11/10
I had my Formal Presentation yesterday. I thought it went well considering how much I was missing. I also finished my tanker drawings. Today I will be working on my alternative solutions and I will try to upload the drawings that I have.
Labels:
Logs
Tuesday, November 9, 2010
FP Outline
* Introduction
* Background of the Problem
- Deepwater Horizon Explosion "BP Oil Spill"
* Design Brief
- Group: To design and create an educational system to model the capture and transport of oil from undersea gushers
- Individual: To design and construct a model of a device capable of transferring an oil-like substance to a retrieval storage device.
* Specs
- Must remain inside of tank at all times during testing
- Must be able to stay on the surface of the water
- Must be able to gather all oil without any help
- Must be free of any leaks
* Limits
- Cannot exceed the size of the tank
- Cannot take to long to build (preferably before testing)
- Total cost cannot exceed $200
- Power cannot exceed the amount of power available for the entire model to use
* Test Procedures
- Will model transportation of the captured well oil to a retrieval storage device
- Amount of "oil" will be measured before and after the transportation stage
- "Oil" lost will show how bad the system is
- Multiple videos should be taken from different angles to document the results accurately
- Sample Questionnaire:
1) Was more "oil" added to the water during transportation?
2) Did the transportation stage run smoothly?
3) How convenient is the method of transportation chosen to transport the oil-like substance?
4) Is there a simpler way to transport the substance?
* Brainstorming
- Getting the oil out of the water:
1) Water Vacuum System
2) Oil Skimmer
3) Oil Sorbent
4) Manually
- Moving the oil from the rig:
1) Small Barge (ideal for moving small amounts of oil)
2) Small Tanker
3) Large Tanker (ideal for moving massive amounts of oil)
*Conclusion
* Background of the Problem
- Deepwater Horizon Explosion "BP Oil Spill"
* Design Brief
- Group: To design and create an educational system to model the capture and transport of oil from undersea gushers
- Individual: To design and construct a model of a device capable of transferring an oil-like substance to a retrieval storage device.
* Specs
- Must remain inside of tank at all times during testing
- Must be able to stay on the surface of the water
- Must be able to gather all oil without any help
- Must be free of any leaks
* Limits
- Cannot exceed the size of the tank
- Cannot take to long to build (preferably before testing)
- Total cost cannot exceed $200
- Power cannot exceed the amount of power available for the entire model to use
* Test Procedures
- Will model transportation of the captured well oil to a retrieval storage device
- Amount of "oil" will be measured before and after the transportation stage
- "Oil" lost will show how bad the system is
- Multiple videos should be taken from different angles to document the results accurately
- Sample Questionnaire:
1) Was more "oil" added to the water during transportation?
2) Did the transportation stage run smoothly?
3) How convenient is the method of transportation chosen to transport the oil-like substance?
4) Is there a simpler way to transport the substance?
* Brainstorming
- Getting the oil out of the water:
1) Water Vacuum System
2) Oil Skimmer
3) Oil Sorbent
4) Manually
- Moving the oil from the rig:
1) Small Barge (ideal for moving small amounts of oil)
2) Small Tanker
3) Large Tanker (ideal for moving massive amounts of oil)
*Conclusion
Labels:
Outline
Log 11/9/10
Today I will be working on my alternative solutions and I will try to get my blog updated.
Labels:
Logs
Wednesday, November 3, 2010
Log 11/3/10
Presentations continued today. My team, and ES and MM, did not present today. Instead, we will all be presenting after the four day weekend when DA comes back.
**Since there were only three days of school this week I decided to write my log today.**
**Since there were only three days of school this week I decided to write my log today.**
Labels:
Logs
Tuesday, November 2, 2010
Log 11/2/10
Presentations began today. My team is scheduled to go tomorrow, but I will not be presenting until after the four day weekend.
Labels:
Logs
Subscribe to:
Posts (Atom)